It's exciting to see the Barn Door has been hung between the dining room and the kitchen. Jim tells me it was a bear to put up. Well worth it, I would say. In the distance you can see the kitchen cabinets that have also been hung.


The siding is going up on the lower of the two duplexes. Since this picture was taken, the lower level is about complete! I really like the gray that John has chosen.


There's been action on the upper duplex this week, with back fill being placed around the foundation and gravel put on the interior, preparing for insulation and then the concrete floors. Only 1/2 of each duplex is spoken for yet, and from the top floors you'll have a spectacular view of the hills around the southern part of Iowa City.