Saturday, October 13, 2018

Things Are Happening at Prairie Hill!

A Second Garage Building Is Going Up.  One day this week, Jim (yellow T-shirt and foreman of our construction team) was laying out the materials for a new garage on the ground. The next day he and Tom (grey T-shirt) were raising the structure. Here they are on the third day.


And here they are on the fourth day, which was in the 40's.

And by the end of the day, the building already looked like this!


Meanwhile, our Detention Basin, despite many, many inches of rain falling in the last couple of weeks, has been functioning well. We've watched with interest as several families of ducks have enjoyed the water. You can see in the background the mound of dirt for the excavation of our next building, a one-story duplex.

The duplex is going on this site, just below and to the south of the completed two-story duplex.


Here's a closer shot of that completed duplex. Barb and Del have moved into the south side, with the other side still available to a new cohousing member.

Here's a photo of our second completed two-story duplex. John has moved into his new home on the left, and the one on the right is as yet unsold.

The herbs and flowers in the new raised beds at the upper entrance of the common house are still going strong, but temperatures are due to get into the 20's this coming week. It's a good time for us to harvest, and also to plant trees and shrubs.